Completed


  • Scope: General contractor, from earthworks to key in hand, including civil and sanitary works. Owner: Grupo Universal SA Customer: Grupo Universal SA Date: 2017 Earthwork of the entire land area. Combination of steel and concrete three story commercial building.
  • Scope: Construction as general contractor, from earthmoving to turnkey Academy. Owner: Minnesota Twins Philadelphia Phillies Customer: Minnesota Twins Philadelphia Phillies Date: January 2017 Earthwork of the entire land area, construction of 12 baseball fields, main building consisted of two floors, club-house and additional buildings.
  • Scope: Engineering, supply and installation of 5,000M2 pre-engineered steel building to serve as rum aging facility. Customer: Alza Investments, LLC. Date: 2014 Design and construction of access roads leading from the current Juan Pablo II highway to the site of the plant as well as a  medium voltage power line, 12.5Kv. Design and construction of […]
  • Reinforced concrete commercial building (4 floors plus basement). Underground parking area for 40 cars and Butler metal building. Besides workshops machinery for heavy vehicles.
  • Scope: Construction as general contractor, from earthmoving to turnkey Academy. Owner: Seattle Mariners Training Academies LLC. Customer: Seattle Mariners Training Academies LLC. Date: 2013 Earthwork of the entire land area, construction of 4 baseball fields, main building consisted of two floors, club-house and additional buildings. From earthworks to play ball in 12 months.
  • Earth Movement (Total área 22,374m2), including material extraction and fill. Construction of perimetral welded mesh wall to delineate the area and reinforced concrete structure to house solar panel transformers.
  • Well water drilling (3 units), installation of submersible pumps (50 HP), placement of 8” buried pipes. Flood Control and Automation. Interconnection with Quisqueya I, system valves, checks, records and controls.
  • Well water drilling (3 units), installation of submersible pumps (50 HP), placement of 8” buried pipes. Flood Control and Automation.
  • Refurbishment and extension of deck and pool, gazebo building and other facilities.
  • Reinforced concrete structures consisting of 0.40 m bearing walls 32 meters in length, to support a 4 lane highway at an elevation of 6.5 meters.
  • Civil Works, Architecture, Design, Pre Engineered Building Supply and Installation. Engineering, Civil Works, Supply and Installation of 600m² warehouse building, for warehousing and logistics operations of drinks. Civil works and installation of natural gas from the boiler area to the power plant.
  • Engineering, Supply and Installation. Engineering, Supply and Installation of 33,000 Sq Ft. of BUTLER CMR 24 roof system.
  • Turnkey construction of a 3 story, 30,000 Sq Ft. reinforced concrete building.
  • 1st International Project for EC. Engineering, Supply and Installation of the Pre Engineered Steel Building and auxiliary structures for a 15 Mw HFO Power Plant located in Bonaire, Dutch Antilles.
  • Feasibility study, Architecture, Design, Structural Engineering, Civil Works and Water Treatment. Earth Works, Structural Analysis and Design, Steel Structures and Concrete works for a 50,000 liter Alcohol Distillery and sugar cane grinding integrated facility.
  • Architecture, Design, Construction, Electrical Design, Supply, Civil Works, Building Erection and Electrical Installations for 7 Steel Buildings totalling 22,000 Sq Ft.
  • Engineering, Supply and Installation. Engineering, Supply and Installation of 165,000 Sq Ft. of BUTLER Standing Seam MR 24 roof system.
  • Engineering and Supply and Installation of 5 Pre Engineered Steel Buildings for the Pre Cast Concrete Plant and Tunneling support equipment.
  • Architecture, Design, Pre Engineered Building Supply. Engineering and Supply of a Pre Engineered Steel Building for the Emergency Backup Power for the Sto Dgo Mass Transit System.
  • Feasibility study, Architecture, Design, Construction, Electrical, Mechanical and Water Treatment. Turnkey construction of a 30,000 sq ft. industrial laundry.
  • Feasibility Study, Architecture, Design, Construction, Electrical, Mechanical and Water Treatment. Turnkey construction of a 500,000 sq ft. integrated textile facility. Engineering and Supply of a Wastewater Heat Recovery System.