Scope: General contractor, from earthworks to key in hand, including civil and sanitary works. Owner: Grupo Universal SA Customer: Grupo Universal SA Date: 2017 Earthwork of the entire land area. Combination of steel and concrete three story commercial building.
Scope: Construction as general contractor, from earthmoving to turnkey Academy. Owner: Minnesota Twins Philadelphia Phillies Customer: Minnesota Twins Philadelphia Phillies Date: January 2017 Earthwork of the entire land area, construction of 12 baseball fields, main building consisted of two floors, club-house and additional buildings.
Scope: Engineering, supply and installation of 5,000M2 pre-engineered steel building to serve as rum aging facility. Customer: Alza Investments, LLC. Date: 2014 Design and construction of access roads leading from the current Juan Pablo II highway to the site of the plant as well as a medium voltage power line, 12.5Kv. Design and construction of […]
Reinforced concrete commercial building (4 floors plus basement). Underground parking area for 40 cars and Butler metal building. Besides workshops machinery for heavy vehicles.
Scope: Construction as general contractor, from earthmoving to turnkey Academy. Owner: Seattle Mariners Training Academies LLC. Customer: Seattle Mariners Training Academies LLC. Date: 2013 Earthwork of the entire land area, construction of 4 baseball fields, main building consisted of two floors, club-house and additional buildings. From earthworks to play ball in 12 months.
Earth Movement (Total área 22,374m2), including material extraction and fill. Construction of perimetral welded mesh wall to delineate the area and reinforced concrete structure to house solar panel transformers.
Well water drilling (3 units), installation of submersible pumps (50 HP), placement of 8” buried pipes. Flood Control and Automation. Interconnection with Quisqueya I, system valves, checks, records and controls.
Civil Works, Architecture, Design, Pre Engineered Building Supply and Installation. Engineering, Civil Works, Supply and Installation of 600m² warehouse building, for warehousing and logistics operations of drinks. Civil works and installation of natural gas from the boiler area to the power plant.
1st International Project for EC. Engineering, Supply and Installation of the Pre Engineered Steel Building and auxiliary structures for a 15 Mw HFO Power Plant located in Bonaire, Dutch Antilles.
Feasibility study, Architecture, Design, Structural Engineering, Civil Works and Water Treatment. Earth Works, Structural Analysis and Design, Steel Structures and Concrete works for a 50,000 liter Alcohol Distillery and sugar cane grinding integrated facility.
Architecture, Design, Pre Engineered Building Supply. Engineering and Supply of a Pre Engineered Steel Building for the Emergency Backup Power for the Sto Dgo Mass Transit System.
Feasibility study, Architecture, Design, Construction, Electrical, Mechanical and Water Treatment. Turnkey construction of a 30,000 sq ft. industrial laundry.
Feasibility Study, Architecture, Design, Construction, Electrical, Mechanical and Water Treatment. Turnkey construction of a 500,000 sq ft. integrated textile facility. Engineering and Supply of a Wastewater Heat Recovery System.