Scope:
Engineering, supply and installation of 5,000M2 pre-engineered steel building to serve as rum aging facility.
Customer:
Alza Investments, LLC.
Date:
2014
Design and construction of access roads leading from the current Juan Pablo II highway to the site of the plant as well as a medium voltage power line, 12.5Kv.
Design and construction of water supply system, including well and waste water treatments.