  • Scope: General contractor, from earthworks to key in hand, including civil and sanitary works. Owner: Grupo Universal SA Customer: Grupo Universal SA Date: 2017 Earthwork of the entire land area. Combination of steel and concrete three story commercial building.
  • Scope: Construction as general contractor, from earthmoving to turnkey Academy. Owner: Minnesota Twins Philadelphia Phillies Customer: Minnesota Twins Philadelphia Phillies Date: January 2017 Earthwork of the entire land area, construction of 12 baseball fields, main building consisted of two floors, club-house and additional buildings.
  • Scope: Engineering, supply and installation of 5,000M2 pre-engineered steel building to serve as rum aging facility. Customer: Alza Investments, LLC. Date: 2014 Design and construction of access roads leading from the current Juan Pablo II highway to the site of the plant as well as a  medium voltage power line, 12.5Kv. Design and construction of […]
  • Reinforced concrete commercial building (4 floors plus basement). Underground parking area for 40 cars and Butler metal building. Besides workshops machinery for heavy vehicles.
  • Scope: Construction as general contractor, from earthmoving to turnkey Academy. Owner: Seattle Mariners Training Academies LLC. Customer: Seattle Mariners Training Academies LLC. Date: 2013 Earthwork of the entire land area, construction of 4 baseball fields, main building consisted of two floors, club-house and additional buildings. From earthworks to play ball in 12 months.
  • Earth Movement (Total área 22,374m2), including material extraction and fill. Construction of perimetral welded mesh wall to delineate the area and reinforced concrete structure to house solar panel transformers.
  • Well water drilling (3 units), installation of submersible pumps (50 HP), placement of 8” buried pipes. Flood Control and Automation. Interconnection with Quisqueya I, system valves, checks, records and controls.
  • Well water drilling (3 units), installation of submersible pumps (50 HP), placement of 8” buried pipes. Flood Control and Automation.
  • Refurbishment and extension of deck and pool, gazebo building and other facilities.
  • Reinforced concrete structures consisting of 0.40 m bearing walls 32 meters in length, to support a 4 lane highway at an elevation of 6.5 meters.
  • Civil Works, Architecture, Design, Pre Engineered Building Supply and Installation. Engineering, Civil Works, Supply and Installation of 600m² warehouse building, for warehousing and logistics operations of drinks. Civil works and installation of natural gas from the boiler area to the power plant.
  • Engineering, Supply and Installation. Engineering, Supply and Installation of 33,000 Sq Ft. of BUTLER CMR 24 roof system.
  • Turnkey construction of a 3 story, 30,000 Sq Ft. reinforced concrete building.
  • 1st International Project for EC. Engineering, Supply and Installation of the Pre Engineered Steel Building and auxiliary structures for a 15 Mw HFO Power Plant located in Bonaire, Dutch Antilles.
  • Feasibility study, Architecture, Design, Structural Engineering, Civil Works and Water Treatment. Earth Works, Structural Analysis and Design, Steel Structures and Concrete works for a 50,000 liter Alcohol Distillery and sugar cane grinding integrated facility.
  • Architecture, Design, Construction, Electrical Design, Supply, Civil Works, Building Erection and Electrical Installations for 7 Steel Buildings totalling 22,000 Sq Ft.
  • Engineering, Supply and Installation. Engineering, Supply and Installation of 165,000 Sq Ft. of BUTLER Standing Seam MR 24 roof system.
  • Engineering and Supply and Installation of 5 Pre Engineered Steel Buildings for the Pre Cast Concrete Plant and Tunneling support equipment.
  • Architecture, Design, Pre Engineered Building Supply. Engineering and Supply of a Pre Engineered Steel Building for the Emergency Backup Power for the Sto Dgo Mass Transit System.
  • Feasibility study, Architecture, Design, Construction, Electrical, Mechanical and Water Treatment. Turnkey construction of a 30,000 sq ft. industrial laundry.
  • Feasibility Study, Architecture, Design, Construction, Electrical, Mechanical and Water Treatment. Turnkey construction of a 500,000 sq ft. integrated textile facility. Engineering and Supply of a Wastewater Heat Recovery System.
  • Feasibility Study, Architecture, Design, Construction and Civil Work. Golf Villa 1sty 2nd Stage,constructed from 1984 to 1985. They were the first Tourism Golf Villas in Dominican Republic, with the concept of being used by owners or for rental as hotel rooms. Located on the Hole No.1 of the Teeth of The Dog Course.
  • Banco Popular Dominicano, La Romana Rep. Dom. constructed in Reinforced concrete and concrete blocks structure. Precasting of the exterior concrete cladding in advance of the roof slab pour. Constructed in 1971, Zona Franca La Romana 1, Hyperbolic Paraboloids who in regard to the cascade of ceiling of double curvature works with a compression that results in a single thickness of 7 cm. Each building is 1,600Mt2 with only 2 interior columns.