1.5 Mw Solar Plant CEMEX

Owner:

Consolar Holding, S. A.

Date:

2014

Scope:

  • Earth Movement (Total área 22,374m2), including material extraction and fill
  • Construction of perimetral welded mesh wall to delineate the area and reinforced concrete structure to house solar panel transformers.

Related Portfolio

  • Scope: General contractor, from earthworks to key in hand, including civil and sanitary works. Owner: Grupo Universal SA Customer: Grupo Universal SA Date: 2017 Earthwork of the entire land area. Combination of steel and concrete three story commercial building.
  • Scope: Construction as general contractor, from earthmoving to turnkey Academy. Owner: Minnesota Twins Philadelphia Phillies Customer: Minnesota Twins Philadelphia Phillies Date: January 2017 Earthwork of the entire land area, construction of 12 baseball fields, main building consisted of two floors, club-house and additional buildings.
  • Scope: Engineering, supply and installation of 5,000M2 pre-engineered steel building to serve as rum aging facility. Customer: Alza Investments, LLC. Date: 2014 Design and construction of access roads leading from the current Juan Pablo II highway to the site of the plant as well as a  medium voltage power line, 12.5Kv. Design and construction of […]