Well Water System (Quisqueya 2)

Scope:

Design and construction of wells, pipes and control adduction.

Owner:

Empresa Generadora de Electricidad Haina, S.A. (EGE Haina)

Customer:

Empresa Generadora de Electricidad Haina, S.A. (EGE Haina)

Date:

2012

Well water drilling (3 units), installation of submersible pumps (50 HP), placement of 8” buried pipes. Flood Control and Automation. Interconnection with Quisqueya I, system valves, checks, records and controls.


Related Portfolio

  • Scope: General contractor, from earthworks to key in hand, including civil and sanitary works. Owner: Grupo Universal SA Customer: Grupo Universal SA Date: 2017 Earthwork of the entire land area. Combination of steel and concrete three story commercial building.
  • Scope: Construction as general contractor, from earthmoving to turnkey Academy. Owner: Minnesota Twins Philadelphia Phillies Customer: Minnesota Twins Philadelphia Phillies Date: January 2017 Earthwork of the entire land area, construction of 12 baseball fields, main building consisted of two floors, club-house and additional buildings.
  • Scope: Engineering, supply and installation of 5,000M2 pre-engineered steel building to serve as rum aging facility. Customer: Alza Investments, LLC. Date: 2014 Design and construction of access roads leading from the current Juan Pablo II highway to the site of the plant as well as a  medium voltage power line, 12.5Kv. Design and construction of […]